
Location
Toronto, ON
Client
St. Jude Health Network
Year
2023
A state-of-the-art 500,000 sq ft hospital facility designed from the ground up to achieve LEED Platinum certification, focusing on extreme energy efficiency and patient comfort.
The primary challenge was designing a robust HVAC and electrical system capable of running 24/7 with zero downtime, while simultaneously reducing the facility's overall carbon footprint by 40% compared to standard hospitals.
We implemented an advanced geothermal heating and cooling system paired with smart energy recovery ventilators. The electrical systems feature triple-redundancy with integrated solar power backups.
100%
Code Compliance
A+
Energy Rating
Require precision MEP engineering for your next development?
Discuss a Project


